Mercy Hospital Unity Campus - CT1 Replacement
The CT1 Replacement project included the removal of existing CT equipment. All finishes, including existing casework, were removed and replaced. This included the attached toilet room and the control room. New CT equipment was installed.
Key Features:
A mobile CT trailer was used during the downtime for renovation. A fully enclosed temporary walkway was also built for patient and staff use.
Location: Fridley, MN
Client: Allina Health
Architect: Pope Architects
Schedule: February 2022 - March 2022
Size: 1,500 square feet